One process, six steps, and a lead time attached to each of them. Below is what happens after you send a brief, who is responsible for it, and what you should have in writing before the next step starts.
Most enquiries stall because the first reply is a question rather than an answer. Ours carries the three numbers buyers need to decide whether to keep talking.
Not a container. The opening quantity for the format you asked about, and what changes if you take a larger volume or a second SKU.
FOB and CIF, by volume tier. It is a band rather than a single number because packaging and format move it — but it is enough to test against your target retail price.
Lead time, what the sample costs, and whether that cost is credited against your first order. Stated in the first reply, not discovered after you ask for samples.
If your brief is still vague — "we want to add a freeze-dried line" — that is enough to start. We will ask the two or three questions that actually change the answer, rather than send a form.
Lead times run in working days from a named start point, so you can hold us to them. Where a step depends on something from your side, it says so.
Category, format, pack size, market and volume. Sent through the form or by email.
MOQ, price band and sampling policy, from someone who can answer rather than route.
FOB / CIF by volume tier, written specification, sampling terms.
Made to the agreed specification, plus courier transit.
1–3 days to lock the spec and receive the deposit, then the production run.
Final inspection, export documents, loading.
The 25–35 day production window starts on deposit and artwork approval, whichever is later. Artwork is the item most often still open at that point — approving it early is the single biggest lever you have over the delivery date.
Nothing here is agreed verbally. Each step closes with a document, and the next step does not start until it is agreed.
| Within 24 hours | MOQ for the line · indicative FOB and CIF band · sampling lead time, fee and whether it is credited against the first order |
|---|---|
| Quotation (1–2 days) | Price by volume tier · written specification (protein, format, grading, pack, net weight) · sampling terms · lead time from a named start point |
| Sampling (7–10 days) | Physical samples · the specification sheet they were made against · courier tracking |
| Order confirmation (1–3 days) | Proforma invoice listing specification, quantity, price terms and payment arrangement · production schedule with the run dates on it |
| Production (25–35 days) | Photo updates at three QC checkpoints · notice of any deviation before shipment, not after |
| QC & shipping (3–5 days) | Final inspection record · packing list and invoice · bill of lading · the export documents your market requires, as agreed in the quotation |
Lead times are only useful if you know what breaks them. In our experience it is rarely production itself:

Category, market and rough volume is enough for a useful first reply. We answer within 24 hours on business days.